Public Notices

Search

Select a Date Range

High speed internet installation impacts Town boulevards

Posted on Thursday, June 08, 2023 12:51 PM

You may have noticed boulevard digging in areas of Caledon to add high speed internet infrastructure. These boulevards will be restored.

The Town of Caledon, with contributions from Provincial and Federal governments, is delivering on its commitment to ensure all residents have access to high-speed internet. As part of this work, there will be impacts to boulevards.

Staff is working with Internet service providers to encourage them to build out their networks within Caledon. The work that...

Microsurfacing of Silvervalley Drive

Posted on Thursday, June 08, 2023 11:56 AM

What are we doing?

  • Microsurfacing is a road maintenance tool intended to extend the life of existing asphalt and create a slightly smoother riding surface by placing a layer of asphalt-based material on the entire surface.

Why?
  • To extend the life of the pavement surface and slightly improve the riding surface.
When?
  • The Contractor will start work in various locations on June 7, 2023 and be completed by June 14, 2023 weather permitting. The work on your street is expected to take one to two...

Microsurfacing of Sackville Street and Dalton Street

Posted on Thursday, June 08, 2023 11:33 AM

What are we doing?

  • Microsurfacing is a road maintenance tool intended to extend the life of existing asphalt and create a slightly smoother riding surface.
Why?
  • To extend the life of the pavement surface and slightly improve the riding surface.
When?
  • The Contractor will complete the work on June 12, 2023, weather permitting.

Where?
  • Sackville Street and Dalton Street (from Hickman Street to Temperance Street)
Who can you call?

Town of Caledon

  • Lisa Wooldridge - Operations Coordinator - 905-584-2272 ext....

Centreville Creek Road Culvert Replacement

Posted on Thursday, June 01, 2023 02:14 PM

Centreville Creek Road Culvert Replacement (OSIM Structure ID: C22022028) Between Healey Road and King Street

Culvert replacement works will be completed on a Centreville Creek Road structure (ID: C22022028), from Healey Road to King Street.

Full Road Closure. Designated detour route is The Gore Road, Healey Road, and King Street. Local traffic will be permitted, however there will be an open cut within the road to complete the culvert replacement. The works are anticipated to start the week of...

Microsurfacing work on three sections of roads

Posted on Monday, May 29, 2023 12:22 PM

What are we doing?

  • Microsurfacing is a road maintenance tool intended to extend the life of existing asphalt and create a slightly smoother riding surface.
Why?
  • To extend the life of the pavement surface.

When?
  • The Contractor will start work in various locations on May 29, 2023, and be completed by June 9, 2023, weather permitting. The work on your street is expected to take one to two business days.

Where?
  • Horseshoe Hill Road (The Grange Side Road to Escarpment Side Road)
  • Creditview Road (Kennedy Road...